{"id":2607,"date":"2019-11-18T13:33:56","date_gmt":"2019-11-18T13:33:56","guid":{"rendered":"http:\/\/www.www.geoquest-group.fr\/?post_type=avada_portfolio&p=2607"},"modified":"2021-07-09T08:27:02","modified_gmt":"2021-07-09T08:27:02","slug":"reinforced-earth-canada-highway","status":"publish","type":"avada_portfolio","link":"https:\/\/www.geoquest-group.fr\/en\/reinforced-earth\/reinforced-earth-canada-highway\/","title":{"rendered":"Reinforced Earth\u00ae Walls for Highway 407 East Phase 2"},"content":{"rendered":"
Reinforced Earth\u00ae Walls for Highway 407 East Phase 2<\/span><\/p><\/h1><\/div> The Government-owned\u00a0Highway 407 East (407E) P2\u00a0project<\/a> is an extension of the original 108 km-long 407 Express Toll Route in the province of Ontario, the first electronic toll highway in the world. This public-private partnership (P3) project was undertaken to provide an efficient east-west corridor across central Ontario. It is one of the largest highway construction projects ever in the province. The extension of Highway 407E Phase 2 (P2) is approximately 22 kilometres in length, beginning at Harmony Road in Oshawa to Highway 35\/115 in Clarington, and a 10-kilometre north-south connection of Highway 401 to Highway 407 by way of Highway 418. Phase 2 is a Design-Build-Finance-Maintain project which links major interchanges and eases congestion of the highly trafficked 400-series highways in the Greater Toronto Area. Since 2016, Geoquest Company Canada<\/a> has contributed their experience, knowledge, and expertise in the design and supply of MSE walls to deliver a successful major project. Geoquest\u2019s scope of the\u00a0407E P2\u00a0work is approximately 22,000 m2\u00a0of Reinforced Earth\u00ae<\/a>\u00a0 walls distributed throughout 36 structures, which consist of wing walls, mixed abutments<\/a>\u00a0and other structures, including a wall considered to be under submerged conditions. The largest wall with respect to the surface area is 3,000m2 and the tallest in terms of height is 11 m. The Reinforced Earth\u00ae\u00a0techniques that continue to be utilized within this project are the TerraClass\u00ae and TerraTrel\u00ae systems which implement galvanized steel soil reinforcing strips. Due to the tight construction schedule and to achieve the many milestones of the project, it was deemed necessary to accelerate the fabrication process of the precast panels on two separate occasions. The whole Highway 407 extension and Highway 418 is opened to traffic in 2020. <\/p>\n<\/div> Urban mobility brochure<\/span><\/a><\/p>\n<\/div><\/div><\/div> Geoquest brochure<\/span><\/a><\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div>
<\/div><\/div><\/div><\/div>
<\/a><\/span><\/div><\/div><\/div>
<\/a><\/span><\/div><\/div><\/div>
RELATED SOLUTIONS<\/h4><\/a><\/li>
RELATED MARKETS<\/h4><\/a><\/li>
RELATED COUNTRIES<\/h4><\/a><\/li><\/ul><\/div>
RELATED SOLUTIONS<\/h4><\/a><\/li><\/ul><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tTechSpan\u00ae et Reinforced Earth\u00ae pour un projet routier complexe<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tCul\u00e9es de pont<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tTechWall™ Retaining Walls for Pedestrian Crossing<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tRampes d'acc\u00e8s en terre renforc\u00e9e pour le chemin de fer Dakar Express<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tReinforced Earth\u00ae Walls for Ramps and Abutments at Clark Airport<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tTechSpan\u00ae and Reinforced Earth\u00ae for complex road project<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tMurs en terre renforc\u00e9e pour la phase 2 de l'autoroute 407 Est<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tReinforced Earth\u00ae Retaining Walls for Cinta Costera Seafront<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tMoroccan Power Station receives upgrade<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tMurs de sout\u00e8nement TechWall™ pour l'autoroute d'Uchumayo<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tGeoquest® Retaining Walls for High-Speed Rail Line<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>